Lower American River Bank Protection Update (C1, C2, C3A, C3B, C4A)
December 13, 2022
This presentation provided an update to the Lower American River Task Force, detailing the status of two bank protection contracts (C1 and C2), which are currently in construction, and outlined upcoming erosion work (C3A, C3B, C4A) along the Lower American River during future construction seasons.
Presentation Slides
Lower American River Project Update to Bank Protection Working Group
December 6, 2022
This presentation provided an update to the Bank Protection Working Group, detailing the status of current and future bank protection projects along the Lower American River.
Presentation Slides
American River Common Features (ARCF) Supplemental EIS/Subsequent EIR
November 2, 2022 and November 30, 2022
USACE is preparing to draft a Supplemental Environmental Impact Statement/Subsequent Environmental Impact Review (SEIS/SEIR) to analyze changes made during final preliminary design of multiple contract actions within the American River Common Features (ARCF) project that could result in potentially significant environmental effects. This supplemental document will centralize where the public and agencies can look for the most current project information and will bring environmental considerations up to date. The SEIS/SEIR will focus on new or different features of project designs that have evolved since the original 2016 ARCF General Reevaluation Report (GRR) Final Environmental Impact Statement/Final Environmental Impact Report (FEIS/FEIR) was completed, while analyzing the potential environmental impacts of these changes.
The Notice of Intent (NOI) to prepare the draft SEIS/SEIR can be found HERE.
The NOI incorrectly states that the public comment period closes on November 31, 2022. A correction was made to accurately reflect the correct public comment period closing date of December 1, 2022. The correction can be found HERE. The public scoping period has been extended to December 31, 2022.
Virtual public meetings were held November 2 and November 30, 2022, to discuss the development of the Draft SEIS/SEIR. Public comments will be accepted until December 31, 2022, and can be submitted to ARCF_SEIS@usace.army.mil.
Virtual Scoping Meeting Presentation Slides (Updated November 30)
Virtual Scoping Meeting Recording
Lower American River Bank Protection Update (C1, C2, C3A)
September 13, 2022
This presentation provided an update to the Lower American River Task Force, detailing the status of two bank protection contracts (C1 and C2 Season 1), which are currently in construction, and outlined upcoming erosion work (C3A and C2 Season 2) along the Lower American River during the 2023 construction season.
Presentation Slides
Sacramento River East Levee Contract 4 Draft SEA/SEIR Virtual Public Meeting
July 13, 2022
This virtual public meeting discussed the Draft Supplemental Environmental Assessment/Environmental Impact Report for Sacramento River East Levee Contract 4, to be constructed in 2023. Project leaders gave a presentation discussing the proposed work, environmental impacts, and accepted public comments related to the project.
Public Meeting Presentation Slides
Lower American River Mitigation Presentation to Bank Protection Working Group
June 2, 2022
This presentation outlined the what mitigation is, why it's required, and the plan for implementing mitigation measures as it pertains to our erosion work along the Lower American River.
Presentation Slides
Lower American River Erosion Contract 3A Virtual Public Meeting
May 5, 2022
This virtual public meeting discussed the Draft Supplemental Environmental Assessment/Environmental Impact Report. Project leaders gave a presentation discussing the proposed work, environmental impacts, and answered questions related to the project.
Public Meeting Presentation Slides
Sacramento River Erosion Contract 2 Virtual Public Meeting
April 26, 2022
This virtual public meeting discussed the Draft Supplemental Environmental Assessment/Environmental Impact Report. Project leaders gave a presentation discussing the proposed work, environmental impacts, and answered questions related to the project.
Public Meeting Presentation Slides
Construction Information for Sacramento River East Levee Contract 3 (SREL C3) Construction Activities
March 29, 2022
This virtual informational meeting discussed the USACE efforts associated with our upcoming Sacramento River East Levee Contract 3 construction season. Project leaders talked through the scheduled work, expected impacts, and answered questions related to the project. A recording of the presentation and slides are available below.
Webinar Presentation Slides
Construction Information Meeting Recording (Duration: 2:07)
Sacramento River East Levee Contract 3 (SREL C3) Draft SEIR/SEA Virtual Public Meeting
July 14, 2021
This virtual public meeting was held to discuss the Draft Supplemental Environmental Impact Report/Supplemental Environmental Assessment during its 45-day public comment period, which closed on August 1, 2021.
Webinar Presentation Slides
American River Contract 2 Draft SEIS/SEIR Virtual Public Meeting
June 29, 2021
This virtual public meeting discussed the Draft Supplemental Environmental Impact Statement/Supplemental Environmental Impact Report during its 45-day public comment period, which closes on July 19, 2021.
Webinar Presentation Slides
Construction Information for Sacramento River East Levee Contract 2 (SREL C2) Construction Activities
March 12, 2021
This informational meeting described the USACE efforts associated with our Sacramento River East Levee Contract 2 construction season. Project leaders walked through the scheduled work, expected impacts, and answered questions from interested individuals.
Webinar Presentation Slides (PDF)
Sacramento Weir Widening Draft SEIS/SEIR Virtual Public Meeting
Wednesday, August 19, 2020
Webinar Presentation Slides
Looking for more info about the neighboring LEBLS (Lower Elkhorn Basin Levee Study) Project?
Contact: LowerElkhorn@water.ca.gov
American River Contract 2 - Virtual Scoping Public Meeting
Monday, August 17, 2020
Webinar Presentation Slides
Sacramento River Contract 1/River Mile 55.2L Bank Protection - Draft SEA/SEIR Virtual Public Meeting
Monday, July 27, 2020
Meeting Primer & Frequently Asked Questions
Webinar Presentation Slides
Notice of Availability
Draft SEA/SEIR Report
Draft SEA/SEIR Appendices
SREL Contract 2 - Draft Supplemental EA/EIR
Wednesday, July 22, 2020
Meeting Primer & Frequently Asked Questions
Webinar Presentation Slides
Notice of Availability
Draft SEA/SEIR Report
Draft SEA/SEIR Appendices
American River Contract 1 - Draft SEA/SEIR Virtual Public Meeting
Wednesday June 15, 2020
Webinar Presentation Slides