US Army Corps of Engineers
Sacramento District

Results:
Tag: U.S. Army
Clear
  • USACE Awards Construction Contract for Folsom Dam Raise Dike 8

    The U.S. Army Corps of Engineers, Sacramento District awarded a $4.2 million construction contract August 8 to Odin Construction Solutions, Inc., of Rocklin, California, to raise Dike 8 at Folsom Lake by 3.5 feet.
  • New leadership at the Sacramento District

    Col. James J. Handura assumed command of the U.S. Army Corps of Engineers Sacramento District from Col. David G. Ray during a Change of Command ceremony today at the Masonic Temple in downtown Sacramento. Brig. Gen. Kim M. Colloton, commander of the Corps’ South Pacific Division, presided over the ceremony introducing the district’s 33rd commander.
  • Delta Islands and Levees study releases final EIS for review

    The U.S. Army Corps of Engineers Sacramento District today released its final Environmental Impact Statement and draft Chief’s Report for the Delta Islands and Levees Feasibility Study for public review and comment.
  • Sacramento District projects get $2.1 billion in supplemental appropriation

    The U.S. Army Corps of Engineers announced supplemental funding July 5 for five Sacramento District projects, totaling an investment of more than $2.1 billion in flood risk management efforts.
  • Public meeting set regarding Marysville Ring Levee 2019 construction

    A public meeting regarding refined construction plans for Phases 2A South and 2C for the Marysville Ring Levee project will be held Feb. 28 at 4 p.m. in the Yuba County Government Center, located at 915 8th Street in Marysville.
  • Draft feasibility report for Yuba River Eco Study published, meetings set

    The U.S. Army Corps of Engineers Sacramento District published a draft feasibility report and environmental assessment today, marking a major milestone in the Yuba River Ecosystem Restoration feasibility study. The draft report outlines a proposed plan to reconnect the Yuba River to its floodplain, create rearing habitat for juvenile fish, create riparian habitat, and facilitate improved conditions for the natural recruitment of riparian habitat.
  • Corps releases FONSI and Final EA for segments of Martis Valley Trail

    The U.S. Army Corps of Engineers Sacramento District today released its final environmental assessment and finding of no significant impact for approximately 1.5 miles of paved, multi-use recreational trail crossing through federal property at the Martis Creek Lake and Dam Project.
  • USACE awards additional contracts for wildfire debris removal

    With its mission over one third complete, the U.S. Army Corps of Engineers Sacramento District (USACE) has awarded two contracts for the consolidated debris removal program in Northern California following the October 2017 Wildfires.
  • Corps releases final environmental report for Folsom Dam Raise project

    The U.S. Army Corps of Engineers Sacramento District has published the final environmental impact statement/environmental impact report for the Folsom Dam Raise project.
  • Corps awards $204 million contract to begin construction on Isabella Dam modifications

    The U.S. Army Corps of Engineers Sacramento District awarded a $204 million contract on Sept. 18 to Flatiron/Dragados/Sukut Joint Venture of Benicia to construct modifications to the Isabella Lake Dam in Lake Isabella.