image - a family of ducks at Pine Flat Lake

Public Notices

Under the Corps' Regulatory Program, a public notice is the primary method for advising all interested parties of a proposed activity for which a permit is sought. Soliciting comments and information necessary to evaluate the probable impacts on the public interest. Public notices are also published to inform the public about new or proposed regulations, policies, guidance or permit procedures.

Public Notices published by the Sacramento District under the Regulatory Program are posted on this page. Once a public notice is available on-line, an email notification is sent to individuals on the appropriate mailing list.

Comments are due by the expiration date of the public notice.  Only comments submitted by email or in hard copy format through a delivery service, such as the U.S. Postal Service, can be accepted.   Comments must be submitted to the address listed in the public notice.

Sign Up to Receive Our Public Notices

Want to review and comment on proposed projects?  Want to learn about changes to the Regulatory Program?  Add yourself to our public notice email list.  Complete this form and email to SPKRegulatoryMailbox@usace.army.mil.  Once signed up, you’ll receive simple emails which include a link to our webpage where you can get more information. 

Results:
Archive: 2019
Clear
  • SPK-2009-01483, Proposal to Reissue Department of the Army Permit for the California High-Speed Rail, Merced to Fresno Section, Permit Package 1 project, Fresno and Madera Counties, CA

    Expiration date: 4/20/2019

    The U.S. Army Corps of Engineers, Sacramento District, is evaluating a request by the California High-Speed Rail Authority to reissue a Department of the Army permit for construction of Permit Package 1 of the California High-Speed Rail Merced to Fresno Section project. The DA permit for PP1 was originally issued on March 13, 2014, and expired on April 1, 2019. The Authority has not proposed changes to the scope of the project, the environmental or construction footprints, or project impacts, from those previously authorized by the Corps. The previously issued PP1 permit, as modified, authorized permanent impacts to 1.63 acres of wetlands and 7.78 acres of other waters of the U.S., and temporary impacts to 18.83 acres of other waters of the U.S. PP1 is a 24.1-mile segment of the HSR project, located at the southern end of the approximately 65-mile Merced to Fresno Section. The PP1 alignment begins immediately south of Ave. 17, (36.995433° N, -120.042872° W) in Madera County, and continues to just south of State Route 41, (36.723642° N, -119.784803° W) in Fresno County.

  • SPK-2017-00112, Clear Creek Phase 3c Project, Shasta County, CA

    Expiration date: 4/26/2019

    United States Bureau of Reclamation (BOR) has applied for a permit to permanently impact approximately 10.37 acres of waters of the United States, including wetlands, for the Clear Creek Phase 3c project located on Clear Creek, in Section 26, Township 31 North, Range 5 East, Mount Diablo Meridian, Latitude 40.50435°, Longitude -122.40618°, in Shasta County, California.

  • SPK-2017-00826/12669-1, Nimbus Fish Hatchery, Rancho Cordova, Sacramento County, CA

    Expiration date: 4/27/2019

    United States Bureau of Reclamation (BOR) has applied for a permit to permanently impact approximately 10.37 acres of waters of the United States, including wetlands, for the Clear Creek Phase 3c project located on Clear Creek, in Section 26, Township 31 North, Range 5 East, Mount Diablo Meridian, Latitude 40.50435°, Longitude -122.40618°, in Shasta County, California.
  • SPK-2014-00534, Proposal to Issue new Regional General Permit (RGP)

    Expiration date: 4/19/2019

    The U.S. Army Corps of Engineers, Sacramento District, is proposing to issue a new regional general permit (RGP) for activities to restore salmonid habitat in support of the restoration and recovery of Sacramento River winter-run Chinook salmon (Oncorhynchus tshawytscha), Central Valley spring-run Chinook salmon (O. tshawytscha) and Central Valley steelhead (O. mykiss). The proposed RGP covers the range of salmon and steelhead habitat in the Central Valley, Sacramento-San Joaquin Delta (Delta), and Suisun Bay within the boundaries of the Sacramento and San Francisco Districts

  • SPK-2017-01022, Construct the Gemini Solar Project, Clark County, NV

    Expiration date: 4/19/2019

    Arevia Power & Solar Partners XI, LLC has applied for a permit to place dredged or fill material into approximately 36.97 acres of waters of the United States to construct a 690 megawatt alternating current solar facility on federal lands administered by the Bureau of Land Management. The approximately 7,079-acre project site is located approximately 31 miles north-east of Las Vegas, south of Interstate 15, Latitude 36.46487° North, Longitude 114.76397° West, in Clark County, Nevada., and can be seen on the Dry Lake USGS Topographic Quadrangle..