US Army Corps of Engineers
Sacramento District Website

image - construction at Folsom Dam

Today's Yuba River Eco Study Meeting Cancelled

Published Jan. 22, 2018

 Due ‎to the government shutdown, the public meeting for the Yuba River Ecosystem Restoration Feasibility Study scheduled for this afternoon (Jan. 22, 2018)  at the Moss Federal Building in Sacramento has been cancelled. The meeting may be rescheduled as funding, resources, and schedule allow.

The Draft Feasibility Report / Environmental Assessment is still available for review at the following libraries:

• Sacramento Public Library Central Branch - 828 I Street, Sacramento, Ca 95814 • Nevada County Public Library - 980 Helling Way, Nevada City, Ca 95959

• Yuba County Library - 303 Second Street, Marysville, Ca 95901

• Downieville Branch Library - 318 Commercial Street, Downieville, Ca 95936

The draft is also available for download here
http://www.spk.usace.army.mil/Missions/Environmental-Projects/Yuba-River-Eco-Study/

Comments on the draft should be submitted by February 23, 2018.

Comments can be submitted by mail to:

U.S. Army Corps of Engineers, Sacramento District
Attn: Planning Division, 1325 J Street,
Sacramento, California 95814

Or by email to Yuba-River-Eco-Study@usace.army.mil
For e-mailed comments, please include "Yuba River Ecosystem Restoration Feasibility Study" in the subject line and include your physical mailing address.