Natomas Levees Reach A construction
A test drill-site is monitored as a construction team working for the U.S. Army Corps of Engineers prepares to create a cutoff wall, Natomas, Calif., July 2023. This will prevent water from seeping through, or under the levee, and help make the Natomas Basin safer from catastrophic flooding.

Download Image: Full Size (1.54 MB)
Photo by: Joseph Paul Bruton |  VIRIN: 230712-A-PZ119-1002.JPG