221209-A-PZ119-0044
Repairs and fender replacement to the Port’s Docks 7 and 8 along the Stockton Deep-Water Ship Channel are seen in mid-construction following SPK Regulatory’ s confirmation in March 2022 of applicability under a non-reporting Nationwide Permit.

Download Image: Full Size (1.39 MB)
Photo by: Joseph Paul Bruton |  VIRIN: 221209-A-PZ119-0044.JPG