Isabella Dam Safety Modification Project
Victor Ozuna, left, and Floyd Bolton, right, resident engineers with the U.S. Army Corps of Engineers Sacramento District, point out features of the Auxiliary Dam at the Isabella Dam Safety Modification Project to Taylor Levesque, a reporter with 23ABC News Bakersfield, in Lake Isabella, California, April 28, 2022. Crews have been raising the height of both the Main and Auxiliary Dams by 16 feet to reduce flood risk to downstream communities, including Bakersfield. Phase Two of the project is expected to be completed later this year.

Download Image: Full Size (1.89 MB)
Photo by: Jeremy Croft |  VIRIN: 220428-A-XI267-158.JPG