Natomas Reach B Construction
A construction team continues work on Pumping Plant 3 on the landside of Garden Highway Dec. 7, 2021 in Natomas, California. The plant will pump accumulating stormwater runoff from the drainage canal and flood plain into the Sacramento River.

Download Image: Full Size (1.19 MB)
Photo by: J. Paul Bruton |  VIRIN: 211213-A-PZ119-1034.JPG