A team of inspectors including Margaret Engesser, project manager with U.S. Army Corps of Engineers Sacramento District, checks out a section of rock pieces (called rip rap) placed along the Sacramento River for flood erosion control. The rip rap is part of USACE's Flood Risk Management and Ecosystem Restoration project near Hamilton City, California.