Napa bypass project nears halfway mark
Construction continues on the U.S. Army Corps of Engineers’ dry bypass project in downtown Napa, California. The bypass will shortcut floodwater to avoid a horseshoe-like bend in the river that often backs up and causes flooding into downtown Napa. Construction is scheduled for completion in summer 2015.

Download Image: Full Size (0.04 MB)
Photo by: Tyler Stalker |  VIRIN: 140924-A-QE425-921.JPG