Constructing the wind turbine
The wind turbine, 40-foot blade and top section of tower are hoisted into place March 13, 2013, at Black Butte Lake. This unit supplies 11kW of electricity at peak production.

Download Image: Full Size (5.82 MB)
Tags: U.S. Army
Photo by: Seth Jantzen |  VIRIN: 130313-A-ZZ999-001.JPG