Making of a cutoff wall
Slurry mix can be seen flowing into a 35-foot-deep trench along the top of the Reach H levee in Natomas during building of a cutoff wall.

Download Image: Full Size (1.44 MB)
Photo by: J. Paul Bruton |  VIRIN: 210527-A-PZ119-0285.JPG