140625-A-GD309-903
Workers are nearly done installing the first massive Tainter gate for the Folsom Dam auxiliary spillway, putting in one of its two radial arms July 3. The 179-ton steel gate is one of six Tainter gates that will control water flow from Folsom Lake into the new auxiliary spillway. http://bit.ly/firstgate

Download Image: Full Size (0.09 MB)
Photo by: Capt. Michael Meyer |  VIRIN: 140625-A-GD309-903.JPG