Wind power comes to Black Butte Lake
A contractor makes adjustments to the wind turbine 120 feet above Buckhorn Recreation Area at Black Butte Lake. Installation of the turbine took place March 13, 2013. Expected to go online within 30 days, the turbine will help supply the needs of campers.

Download Image: Full Size (0.16 MB)
Tags: U.S. Army
Photo by: Robert Kidd |  VIRIN: 130313-A-AY634-011.JPG