Water Flows Over Fuse Gates of Terminus Dam
The sun sets over the fuse gates in the spillway of Terminus Dam at Lake Kaweah in Tulare County, California, March 16, 2023, following a series of atmospheric rivers that filled the reservoir to its capacity at 185,630 acre-feet. The resulting spillway flow lasted about 36 hours and reached approximately 1,000 cubic feet per second at its peak. (Photo – Ryan Watson, U.S. Army Corps of Engineers, Sacramento District/Released)

Download Image: Full Size (2.11 MB)
Photo by: Ryan Watson |  VIRIN: 230317-A-A1419-0001.JPG