Problem & Need
The Yuba River Basin has experienced seven major floods since 1940, with catastrophic events in 1986 and 1997 causing damages of $95 million and $82.4 million, respectively.

Project Scope
The Marysville Ring Levee project is a multi-phase effort to strengthen 7.6 miles of levee surrounding the city.

Completed Construction
The Marysville Ring Levee project has been progressing in multiple phases, with significant milestones completed, including:

  • icon Reach 1 and 3, Phase 1 – Open Trench Soil Bentonite Cutoff Wall (2014)
  • icon Reach 3, Phase 2A North – Open Trench Soil Bentonite Cutoff Wall (2018)

Current Status
The project is nearing full completion, with the final construction efforts underway:

  • icon Reach 3, Phase 2B – Open Trench Soil Bentonite Cutoff Wall
    • icon 95% complete – Regraded back to full height, with ancillary work in progress