The U.S. Army Corps of Engineers expects to use the gated service spillway at Pine Flat Dam within the next seven days as temperatures rise along the Sierra Nevada, increasing snowmelt runoff that flows to the reservoir.The release is part of normal operations and is implemented when Pine Flat Lake exceeds 85 percent of its authorized capacity,