Workers settle concrete
Workers settle concrete atop the Folsom Dam auxiliary spillway’s new control structure July 26, 2013 in Folsom, Calif. Concrete is placed at night in 5-feet-deep layers called lifts. The concrete must cure for up to three weeks before another section can be placed

Download Image: Full Size (3.91 MB)
Tags: U.S. Army
Photo by: Capt. Michael N. Meyer |  VIRIN: 130726-A-GD309-020.JPG